Source-to-Chip Efficiency Modeler for HVDC-Native AI Campuses — explainer video
A tool to calculate the cost and energy loss of powering AI data centers using high-voltage direct current.
0:53 · Scripted and voiced by GLM and Piper · 15 Nov 2026
Read the full idea →Transcript
Every AI campus converts its power four to six times before a GPU ever sees it. Every conversion is megawatts up in smoke.
Before the one-line diagram locks, an electrical lead must bet on AC or 800 volt DC. And no vendor-neutral tool exists to count the losses across that whole chain, because no single supplier sees it all.
The building blocks are already measured. A published prototype stepped 4.16 kilovolts of AC straight down to a 400 volt DC rack bus at 98.7 percent efficiency.
So imagine a modeler that scores every stage from the fence line to the chip, blending published efficiencies with your own vendor quotes and metered data to price the 800 volt DC case.
Colocation developers, hyperscalers, and power-system vendors could run it before designs lock, sizing recovered megawatts, avoided conversion hardware, and the total-cost gap campus by campus.
The interactive prototype is ready to explore. Run a campus through the chain and see where your megawatts are hiding.
Research it builds on
- Direct Energy Conversion for a D–³He Tandem-Mirror Burner: Recovering Charged-Particle Power Directly Without a Thermal Cycle
- The MetroVolt Data-Center Burner: Direct-DC Campus Power, Q_E Closure, and the Plug Requirement in a Low-Neutron D–³He Tandem Mirror
- High-Frequency Transformer Design with High-Voltage Insulation for Modular Power Conversion from Medium-Voltage AC to 400-V DC
- Medium voltage power distribution architecture with medium frequency isolation transformer for data centers
- Wide bandgap power devices based high efficiency power converters for data center application