Seedlabs
Source research

A Certified Control-Barrier Safety Filter for Fusion Control: Forward-Invariance Guarantees, Calibrated Uncertainty, and an Honest PINN Negative for a Compact Spherical-Tokamak Breeder

Priyanca Ford · 2026 · 13 citationsRead the paper

A nuclear-regulated fusion machine must guarantee that every automated actuation keeps the plasma inside a declared safe operating envelope, and it must do so in a way an auditor can check, not merely trust. Learned and optimisation-based controllers deliver performance but, by themselves, provide no such guarantee. We formalise and verify a deterministic, control-barrier-certified safety filter for a compact spherical-tokamak (ST) breeder that provides a provable zero-escape property. The filter sits between an arbitrary nominal controller and the actuators and returns the minimum-norm edit of the command that keeps the operating point inside a safe set defined by three operational barriers — a Greenwald/first-wall-load density margin, a normalised-pressure (β_N) margin, and a q-kink margin. Robustness to a bounded disturbance w W enters as an explicit, auditable additive tightening η= h W of each barrier; because the actuation is diagonal the filter decouples into three closed-form one-dimensional projections, so it runs solver-free in constant time. We state the reduced-order control-affine model, the robust barrier condition, the closed-form projection and an analytic forward-invariance theorem as explicit equations, and we verify them on the frozen breeder β_N clamp: from the design-point anchor (Q=3.076, P_fus=85.04 MW, I_p=9.66 MA, β_N,0=1.532) an unfiltered greedy controller (u=1.25) drives β_N to 4.200 and violates the barrier on 50 of 100 steps ( h=-0.20), while the filtered controller holds β_N3.500 with h=+0.000 and 0 of 100 violations, using authority confined to u[1.061,1.250] and never touching the actuator floor — so the certificate is not an artefact of saturation. The closed-form projection matches a general quadratic-program solver to machine precision (2.2×10^-16). Scaling the verification to an adversarial injection campaign, the filter projects 3000 of 3000 deliberately unsafe proposed actions back into the safe set with 0 escapes across 150,000 filtered steps and h0 throughout. Because the projection is three scalar comparisons and a clip, it deploys as a latency-split hardware clamp: a compiled look-up-table tier enforces the barrier at ~0.055 , beneath a software tier at ~42 , so enforcement never waits on the learned controller. A finding we did not anticipate, and report as such, is that the certificate is provenance-conditioned: forward invariance is preserved on 10 of 10 barrier-preservation trials when the calibration feeding the barrier passes an integrity (signed-lineage) gate, but on only 1 of 10 when it does not — so the deterministic proof rests on a data-integrity precondition, and lineage is load-bearing for safety, not paperwork. We place the per-step guarantee honestly within a stronger assurance ladder — formal reachability, Simplex runtime assurance, neural-Lyapunov/input-to-state-stability certificates, conformal prediction and out-of-distribution gating — naming which rungs are demonstrated here and which are required-next. We report the surrounding de-risking layer with honest maturity, including a pre-registered negative: a physics-informed neural network intended as a fast native equilibrium solver reaches only 1.4% relative-L^2 error, missing its 1% target — reported, not reframed. We state the scope plainly: the guarantee is for the reduced-order operating-envelope model and the declared disturbance bound; elevating it to a plant guarantee requires validating the model against higher-fidelity core-transport, neoclassical and disruption simulation. Key results (frozen anchors): Q = 3.076; u = 1.25; h = -0.20; delta = -0.30; u = 1; q_95 = 2.90. Methods & codes: FreeGSNKE, FreeGS, CGYRO, OpenMC, Sauter. Live verification: 6 gate validator(s) with live-recompute cards (5 reproduced, 1 revised). See the Verification section and data/verification.csv. Related: Paper page · De-risking register · 3D model · Learn more about Kronos Part of the 2026 Kronos publication series; independently re-run and stamped in the Kronos de-risking register (DOI 10.5281/zenodo.22645689). All numerical values are frozen design-point anchors; see the register. Public research artifact. No proprietary, financial, or supply-chain information is included. Previous version: DOI 10.5281/zenodo.22132176. Please cite this version.