Seedlabs

BlindSpot Scan: AI Risk-Register Coverage Audit Against the 1,725-Risk Corpus

An audit tool that compares a company's AI risks against a massive list of known threats to find gaps.

An audit tool that reads an organization's AI risk register and governance documents, maps every identified risk into a seven-domain causal taxonomy, and reports which risk categories the organization has never addressed — benchmarked against a corpus of 1,725 documented AI risks. It turns 'is our governance complete?' from an opinion into a measurable coverage score.

Computer ScienceEthics and Social Impacts of AI
AI in Healthcare and EducationAI governance assurance and internal audit (risk-register completeness benchmarking)

Concept

A completeness audit for AI governance programs. The tool ingests an organization's existing governance artifacts — AI risk register, acceptable-use policy, model cards, incident runbooks — auto-tags every already-identified risk into the repository's two classification systems (cause: human vs. AI, intentional vs. unintentional, pre- vs. post-deployment; effect: one of seven domains, including discrimination, privacy violations, misinformation, and weapons development), and produces a coverage heat map answering one question: of the 1,725 documented AI risks, which categories does this organization's governance say nothing about?

The deliverable is a ranked gap list — for example, post-deployment, AI-caused, unintentional risks with zero register entries, or a domain covered in policy but with no owner or mitigation — with repository risk IDs attached so the governance team can pull the underlying risk descriptions and close the gap. The single wedge is benchmarking register completeness against an external corpus instead of internal opinion; a register heavy on pre-deployment, human-caused model-quality risks and light on post-deployment AI-caused behavior becomes a specific, actionable finding.

Why now

Before this paper there was no defensible denominator — a risk register could only be judged by whoever wrote it. [0] provides one: 1,725 risks distilled from 74 frameworks, cut along causal dimensions (who causes it, intent, timing) that are precisely where registers are typically lopsided. Older corpus paper [2] shows that even the most-examined domain, discrimination and algorithmic bias, remains one of the most pressing challenges — evidence that strength in one domain says little about coverage in the other six. [3] demonstrates existing demand for structured, evidence-backed audit packs that this scan's heat-map output feeds directly. Readiness is matched to the evidence: it is a document-analysis and mapping product over a published database, delivered as a fixed-scope audit, not a deployed AI system.

Written by GLM · 27 Nov 2026

AI assessment

Backed by 3 papers89

A highly feasible and market-aligned audit tool with a sharp wedge, though its novelty is limited by its close relationship to existing corpus-based compliance ideas.

Evidence strength
5/5
The idea directly leverages the 1,725-risk database and dual-taxonomy system described in the primary research paper, making the technical foundation highly robust.
Market pull
5/5
Large enterprises and audit firms (PwC, etc.) have a high urgency to move from qualitative 'best effort' governance to quantitative, defensible benchmarks for AI risk.
Novelty & moat
2/5
The idea is a direct functional variant of 'RiskRosetta' (similarity 0.74), shifting the value prop from 'translation' to 'gap analysis' using the same underlying corpus.
Feasibility
5/5
The product is essentially a document-analysis and mapping tool using a static database, which is highly feasible for a small team to build as an MVP.
Wedge clarity
5/5
The 'coverage score' provides a sharp, measurable entry point that transforms a vague governance question into a specific, actionable audit finding.
Simplicity / focus
5/5
The product is focused on a single, clear function: auditing a risk register against a specific corpus without over-scoping into a broader platform.

Scored by Gemma 4 · 27 Nov 2026. Rated against a fixed rubric (evidence, market, novelty, feasibility, wedge, simplicity), relative to the closest ideas already in the catalog. A prior estimate to compare ideas before real-world signal arrives.

Act on this idea

Ideas only matter if someone runs with them. Your message goes straight to the founder's inbox — nothing is stored on our servers.

Who benefits

  • PwCcompany

    Its AI assurance practice needs a repeatable, defensible methodology; benchmarking a client register against a 1,725-risk corpus gives auditors an external completeness standard rather than judgment calls.

  • Mayo Clinicorganization

    A health system with dozens of deployed AI tools across clinical operations; a seven-domain coverage heat map shows where oversight of privacy, discrimination, or misinformation risks is thin before an incident or external audit finds it.

  • Its use of algorithms in coverage determinations has drawn public and regulatory scrutiny; a taxonomy-based gap scan is a concrete way to evidence governance completeness to auditors and regulators.

  • Publishes guidance for auditing AI; a corpus-based completeness test gives its members a standard benchmark for evaluating AI risk registers.

Research it builds on

  1. The AI risk repository: A meta-review, database, and taxonomy of risks from artificial intelligence
    Peter Slattery, Alexander K. Saeri, Emily A. C. Grundy et al. · 2026 · 288 citations
    All ideas from this paper →
  2. Discrimination, artificial intelligence, and algorithmic decision-making
    Frederik Zuiderveen Borgesius · 2025 · 154 citations
    All ideas from this paper →
  3. DELTΔX NextGenV12 Thinking — Non-Autonomous AI Governance Corpus, Controlled Agentic Runtime Framework, and Adversarial First-Shot Audit Evidence Pack.
    Jérôme Natalis · 2026 · 2 citations
    All ideas from this paper →
Leave feedback
feasibility